Experiences

Proven Positive Heritage Outcomes

Indigenous, Cultural Heritage, NSW Everick Creative Indigenous, Cultural Heritage, NSW Everick Creative

FRV Solar Farms

Aboriginal Cultural Heritage manager and technical advisor for solar projects. Tasks include managing FRVs legislative compliance, predictive archaeological modelling & risk analysis, CHMP and deed drafting and negotiation, and participation in surveys and archaeological test excavations.

Read More
Indigenous, VIC Everick Creative Indigenous, VIC Everick Creative

Abbotsford Bridge Rehabilitation Project

A Cultural Heritage Management Plan (CHMP) was prepared for TfNSW for the proposed rehabilitation works of this historic Murray River crossing in northwest Victoria. The CHMP is small but involved survey and subsurface test excavation with the First People of the Millewa-Mallee Aboriginal Corporation who are the registered Aboriginal party for the area. Finds include stone artefacts, shell midden, a hearth and glass artefacts which may be associated with the old punt crossing or Yelta Mission which is a few hundred metres downstream.

Read More
NSW, Indigenous, Archaeology Everick Creative NSW, Indigenous, Archaeology Everick Creative

Cobaki Lakes

This ongoing project involved a desktop study, site inspections, extensive consultation with the Aboriginal community, an Aboriginal Cultural Heritage Assessment and an accompanying CHMP. Extensive archaeological excavations have been undertaken, much of which consisted of shell midden.

Read More
NSW, Indigenous Everick Creative NSW, Indigenous Everick Creative

Drainage Pipe Replacement, Dareton

TfNSW is proposing to replace a stormwater drainage pipe on a property and Crown land in far western NSW adjacent to the ancestral bank of the Murray River. Archaeological survey identified and registered a freshwater shell midden which would be impacted by the works. In consultation with the RAPs, an Archaeological Methodology was prepared to support an Aboriginal Heritage Impact Permit (AHIP) application to allow for test excavation within and close to the shell midden to determine the nature and extent of subsurface archaeological deposit and provide the RAPs and TfNSW with management and mitigation options.

Read More
Indigenous, Negotiations, QLD Everick Creative Indigenous, Negotiations, QLD Everick Creative

Queen’s Wharf

Cultural heritage advisor to Destination Brisbane Consortium (DBC). Tasks included consultation with the Aboriginal Parties for the area, technical advice, disturbance assessment, detailed management recommendations, and archaeological excavation supervision.

Read More
Indigenous, QLD, Negotiations Everick Creative Indigenous, QLD, Negotiations Everick Creative

Gold Coast Airport

Aboriginal Cultural Heritage technical advisor to large scale GCA development works. Works include managing legislative compliance, ongoing negotiation with Aboriginal groups and participation in surveys, clearances, and excavation at 33 archaeological test locations, much of which consisted of shell midden. Preparation of archaeological excavation reports and a Cultural Heritage Management Plan.

Read More
Indigenous, QLD Everick Creative Indigenous, QLD Everick Creative

DTMR Warrego Highway

Cultural Heritage Field Assessment including Aboriginal heritage for proposed road widening and tree clearing. Disturbance analysis, archaeological modelling, risk assessment and advice on legislative compliance.

Read More
Indigenous Everick Creative Indigenous Everick Creative

Western Link Transmission Line

Archaeological survey of a 100 km infrastructure corridor. Identification of culturally scared trees. Tasks included the implementation of a Part 7 CHMP, assessment report and developing ongoing management strategies, and providing advice on modern (non-cultural) attempts to imitate Aboriginal rock art.

Read More
Indigenous, QLD Everick Creative Indigenous, QLD Everick Creative

BMA Technical Advisor (Bowen Basin)

Technical advisor to BMA on 15 mine sites and exploration leases. Tasks included CHMP compliance advice, archaeological surveys and internal management advice, internal systems and data management review, regional archaeological modelling and strategic advice.

Read More
Indigenous, Negotiations, Cultural Heritage, QLD Everick Creative Indigenous, Negotiations, Cultural Heritage, QLD Everick Creative

Gladstone East End No. 5 Cement Mine

Aboriginal heritage assessment in support of an EIS and drafting / negotiation of a Part 7 Cultural Heritage Management Plan (CHMP). Assessment in preparation for Cement Australia’s 90 ha mine extension. Project tasks included survey, leading negotiations with Aboriginal parties and their technical advisor, and drafting a CHMP under Part 7 of the ACHA.

Read More